Tuesday, August 11, 2009

Busy Busy Busy

So, besides the windows, the plumbing is done (as Ethan wanted to demonstrate with the back outside faucet), windows are going in, and electricians are stringing a web of wires and cables. Outside, we got a whole bunch of gravel being graded in preparation for the driveway and the columns on the front porch.

No comments:

Post a Comment